Pre-Trade Checklist
What do the trades need so that they can do their best work
- Clean site
- Updated plan for subs
- Printed cabinet drawings - elevations on walls
- Printed appliance specs
- Printed plumbing specs
- Printed electrical specs
- Locations marked on walls or prints
- Door sizes and swings
- Cabinets laid out
- Appliances laid out with specs on site
- Bath fan locations
- Lighting and outlets laid out
- Mark floor finishes on site
- Lay out bathrooms
- Shower – Valve, elbow, head, handshower, rain fall, body sprays, etc
- Baseboard (toilet shut off location)
- Elevation for vanity – Floating, thickened top, splash height